Duqm Refinery LPG Bullet Tanks Project

Start Date: 15.01.2020
Date of Completion: On going project
Equipment used in the project: Demag CC 6800, Demag CC 8800, Liebherr LR 1300 Crawler Cranes
Project Description: Hareket working as the Heavy Lift Contractor for the Petrofac Samsung JV in EPC 2 Area  has successfully completed the erection of 9 units of LPG bullet tanks in the Duqm Refinery, Sultanate of Oman. Each bullet tank weighing approx. 900t were tandem lifted with a 1250t and a 1600t crane. Hareket was responsible to engineer, execute and supervise these critical lifts. The operation was safely carried out and was finished in time.  With the installation of the  bullet tanks, an important progress towards the construction of the Refinery has been reached. This was successfully executed for joint venture of Petrofac International Limited and Samsung Engineering Co Limited