Installing propeller using a SPMT
Start Date: 30.04.2020
Date of Completion: 05.05.2020
Equipment used in the project: 6 Axle SPMT (Self Propelled Modular Trailer)
Project Description: The ship propeller, weighing 45 tons and 5 meters in diameter, was transported on site and installed in Yalova Tersan Shipyard. It is the first propeller of this size, installed using an 6 axle SPMT in Turkey. Congratulations to Hareket engineering and project team for completing this meticulous project safely and on time.