Çalık Energy, Turakurgan 900 mw Combined Cycle Electric Power Plant

Start Date : 03/05/2018

Finish Date: 31/12/2018

Equipments:  290 aks hidrolik dorse, 8 adet 8 dingil uzayabilir dorse,1 adet 8 dingil havuz dorse, 6 adet 4-5 dingil dorse

Project Details : Transportation 3.591 tons loads- which listed below- along 2.500 km from Bautino Port to Turakurgan Combined Cycle Electric Power Plant. 

2 x GT seti (Gaz Türbini ve Jeneratörü)

4x Trafo

2x ST seti (Buhar Türbini ve jeneratörü)

2x HRSG seti (Toplam 24 adet HRSG Modülü)