SDV Horoz Taşimacilik ve TİC.A.Ş.
Start Date: 15.07.2016
Finish Date: 5.09.2016
Project Equipments: 6x4/5 axle blade trailer, 6x8 axle extendable lowbed trailer, 2x200 ton mobile crane, 1x50 ton truck mounted crane
Project Details: Conduction of port operations for 17 Siemens turbines from İzmir Alsancak port, transporting and downloading to Kınık project area.