What are you looking for?

TSGI - Joint Venture Tecnicas Reunidas - Saipem - GS - Itochu

Start Date: 15.10.2015
Finish Date: 11.12.2017
Project Equipments: 84 axle SPMT, 60 axle THP, 6 x 8 axle Faymonville, 4 x 8 axle Faymonvill
Project Details:  In total, the project transported more than 365 tons or more than 17 x 5 x 5 m of weight more than 60 tons. 132 loads from 1 to 50 tons, 149 loads from 50 to 100 tons, 65 loads from 100 to 250 tons, 12 loads from 250 to 500 tons, 4 loads from 500 to 1000 tons, 3 loads from 1000 to 1250 tons. The most oversized loads: 35x8,5x7,6m and 1185 tonne Treating Reactor, 76,5x11,5x12m and 971 tonne Product Fractionator, 81.3x10,15x10,8m and 830 tonne Crude Tower.